Construction techniques used to minimize traffic delay during the replacement of mainline railway bridges
dc.contributor.advisor | R., Wilson | |
dc.contributor.author | Macintosh, Roderick W. | |
dc.date.accessioned | 2023-06-07T19:00:01Z | |
dc.date.available | 2023-06-07T19:00:01Z | |
dc.date.issued | 1986 | |
dc.description.copyright | Not available for use outside of the University of New Brunswick | |
dc.description.note | Macintosh, Roderick W (1986). Construction techniques used to minimize traffic delay during the replacement of mainline railway bridges . (Engineering Senior Report no. T-1290 1986). Fredericton : University of New Brunswick, Dept. of Civil Engineering T-1290 1986 1882/13273 | |
dc.format.medium | electronic | |
dc.identifier.uri | https://unbscholar.lib.unb.ca/handle/1882/32296 | |
dc.language.iso | en_CA | |
dc.publisher | University of New Brunswick | |
dc.rights | http://purl.org/coar/access_right/c_16ec | |
dc.subject.discipline | Engineering | |
dc.title | Construction techniques used to minimize traffic delay during the replacement of mainline railway bridges | |
dc.type | senior report | |
thesis.degree.discipline | Engineering | |
thesis.degree.fullname | Bachelor of Science in Engineering | |
thesis.degree.grantor | University of New Brunswick | |
thesis.degree.level | undergraduate | |
thesis.degree.name | Bachelor of Science in Engineering |