Risk management in construction
dc.contributor.advisor | McKim, Robert | |
dc.contributor.advisor | Robert, McKim | |
dc.contributor.author | Rebolledo, Maria-Isabel | |
dc.date.accessioned | 2023-06-07T17:31:44Z | |
dc.date.available | 2023-06-07T17:31:44Z | |
dc.date.issued | 1990 | |
dc.description.abstract | This report is the result of an extensive literary search on Risk Management. The report describes the stages of risk management required for construction projects. The second part of the report follows through the risk management procedure used for the New Brunswick Electric Power Commission's Belledune Generating Station. | |
dc.description.copyright | Not available for use outside of the University of New Brunswick | |
dc.description.note | Rebolledo, Maria-Isabel (1990). Risk management in construction . (Engineering Senior Report no. T-1472 1990). Fredericton : University of New Brunswick, Dept. of Civil Engineering T-1472 1990 1882/13393 | |
dc.format.medium | electronic | |
dc.identifier.uri | https://unbscholar.lib.unb.ca/handle/1882/30314 | |
dc.language.iso | en_CA | |
dc.publisher | University of New Brunswick | |
dc.rights | http://purl.org/coar/access_right/c_16ec | |
dc.subject.discipline | Civil Engineering | |
dc.title | Risk management in construction | |
dc.type | senior report | |
thesis.degree.discipline | Civil Engineering | |
thesis.degree.fullname | Bachelor of Science in Engineering | |
thesis.degree.grantor | University of New Brunswick | |
thesis.degree.level | undergraduate | |
thesis.degree.name | B.Sc.E. |