Concrete placement productivity in the Fredericton area

dc.contributor.advisorChristian, John
dc.contributor.authorMcCullough, David C.
dc.date.accessioned2023-06-07T21:26:48Z
dc.date.available2023-06-07T21:26:48Z
dc.date.issued1992
dc.description.abstractThis report identifies key adverse factors affecting concrete placement productivity. The camcorder method provided an accurate and reliable data base from which the labour utilization factors and production rates were determined. Production rates were modified to display the affects of delay on productivity. Worker momentum was considered as a secondary adverse affect on production rates. Worker reallocation on site was observed.
dc.description.copyrightNot available for use outside of the University of New Brunswick
dc.description.noteMcCullough, David C (1992). Concrete placement productivity in the Fredericton area . (Engineering Senior Report no. T-1553 1992). Fredericton : University of New Brunswick, Dept. of Civil Engineering T-1553 1992 1882/13947
dc.format.mediumelectronic
dc.identifier.urihttps://unbscholar.lib.unb.ca/handle/1882/35897
dc.language.isoen_CA
dc.publisherUniversity of New Brunswick
dc.rightshttp://purl.org/coar/access_right/c_16ec
dc.subject.disciplineCivil Engineering
dc.titleConcrete placement productivity in the Fredericton area
dc.typesenior report
thesis.degree.disciplineCivil Engineering
thesis.degree.fullnameBachelor of Science in Engineering
thesis.degree.grantorUniversity of New Brunswick
thesis.degree.levelundergraduate
thesis.degree.nameB.Sc.E.