Feasibility of incorporating running-time into preventive maintenance program at NB Power's Point Lepreau G.S.
dc.contributor.author | Boucher, Stéphane N. | |
dc.date.accessioned | 2023-06-07T17:30:37Z | |
dc.date.available | 2023-06-07T17:30:37Z | |
dc.date.issued | 2002 | |
dc.description.copyright | Not available for use outside of the University of New Brunswick | |
dc.description.note | Boucher, Stéphane N (2002). Feasibility of incorporating running-time into preventive maintenance program at NB Power's Point Lepreau G.S. . (Engineering Senior Report no. TM-1008 2002). Fredericton : University of New Brunswick, Dept. of Mechanical Engineering TM-1008 2002 1882/15881 | |
dc.format.medium | electronic | |
dc.identifier.uri | https://unbscholar.lib.unb.ca/handle/1882/30172 | |
dc.language.iso | en_CA | |
dc.publisher | University of New Brunswick | |
dc.rights | http://purl.org/coar/access_right/c_16ec | |
dc.subject.discipline | Engineering | |
dc.title | Feasibility of incorporating running-time into preventive maintenance program at NB Power's Point Lepreau G.S. | |
dc.type | senior report | |
thesis.degree.discipline | Engineering | |
thesis.degree.fullname | Bachelor of Science in Engineering | |
thesis.degree.grantor | University of New Brunswick | |
thesis.degree.level | undergraduate | |
thesis.degree.name | Bachelor of Science in Engineering |