Feasibility of incorporating running-time into preventive maintenance program at NB Power's Point Lepreau G.S.

dc.contributor.authorBoucher, Stéphane N.
dc.date.accessioned2023-06-07T17:30:37Z
dc.date.available2023-06-07T17:30:37Z
dc.date.issued2002
dc.description.copyrightNot available for use outside of the University of New Brunswick
dc.description.noteBoucher, Stéphane N (2002). Feasibility of incorporating running-time into preventive maintenance program at NB Power's Point Lepreau G.S. . (Engineering Senior Report no. TM-1008 2002). Fredericton : University of New Brunswick, Dept. of Mechanical Engineering TM-1008 2002 1882/15881
dc.format.mediumelectronic
dc.identifier.urihttps://unbscholar.lib.unb.ca/handle/1882/30172
dc.language.isoen_CA
dc.publisherUniversity of New Brunswick
dc.rightshttp://purl.org/coar/access_right/c_16ec
dc.subject.disciplineEngineering
dc.titleFeasibility of incorporating running-time into preventive maintenance program at NB Power's Point Lepreau G.S.
dc.typesenior report
thesis.degree.disciplineEngineering
thesis.degree.fullnameBachelor of Science in Engineering
thesis.degree.grantorUniversity of New Brunswick
thesis.degree.levelundergraduate
thesis.degree.nameBachelor of Science in Engineering

Files

Collections