A cost analysis of highway paving in New Brunswick

dc.contributor.authorSeheult, Peter
dc.date.accessioned2023-06-07T21:17:55Z
dc.date.available2023-06-07T21:17:55Z
dc.date.issued1991
dc.description.abstractThe cost of paving highways v a r i e s througout New Brunswick. This report determines i f the p r i c e variance i s s i g n i f i c a n t l y large through s t a t i s t i c a l means. The report then focuses on explaining t h i s variance s i z e . This i s accomplished through the a n a l y s i s of four f a c t o r s . These factors are; the a v a i l a b l e resources i n the area, the competition, the s i z e of the job and the season of work. Trends for these factors have been i d e n t i f i e d and represented g r a p h i c a l l y. The factors are then ranked in importance in explaining the variance of the paving p r i c e s . The amount explained by these f a c t o r s i s a l s o found through s t a t i s t i c a l means and expressed i n percentage terms.
dc.description.copyrightNot available for use outside of the University of New Brunswick
dc.description.noteSeheult, Peter (1991). A cost analysis of highway paving in New Brunswick . (Engineering Senior Report no. T-1522 1991). Fredericton : University of New Brunswick, Dept. of Civil Engineering T-1522 1991 1882/16084
dc.format.mediumelectronic
dc.identifier.urihttps://unbscholar.lib.unb.ca/handle/1882/35261
dc.language.isoen_CA
dc.publisherUniversity of New Brunswick
dc.rightshttp://purl.org/coar/access_right/c_16ec
dc.subject.disciplineCivil Engineering
dc.titleA cost analysis of highway paving in New Brunswick
dc.typesenior report
thesis.degree.disciplineCivil Engineering
thesis.degree.fullnameBachelor of Science in Engineering
thesis.degree.grantorUniversity of New Brunswick
thesis.degree.levelundergraduate
thesis.degree.nameB.Sc.E.

Files

Collections