A graphical interface for resource constrained scheduling

Loading...
Thumbnail Image

Date

1992

Journal Title

Journal ISSN

Volume Title

Publisher

University of New Brunswick

Abstract

This report discusses the development of a graphical interface for resource constrained scheduling. Some programs, such as Primavera, do level resources but these are black boxes. The user inputs the required data, the computer performs the calculations and gives the output. The problem is that the user can not see the calculations that the computer is performing, therefore it is difficult for the user to intelligently modify the output. This process is known as a black box. The interface developed in this report, called RCS(Resource Constrained Scheduling), displays for the user the resource constrained and squence constrained activities. The program allows the user to modify the output to find an optimum schedule. The menu options guide the user through the modification process. Another feature of RCS is that it allows for interruptions in activities as oppose to delaying the entire activity.

Description

Keywords

Citation

Collections